In cold weather slide the panels tight against the eave flashing and in warm weather allow a gap for expansion.
Standing seam metal roof installation instructions.
Apply row of tube sealant along back face of zee closure adjacent to panel legs.
Standing seam metal roof installation process.
I prefer a hatchet but in some.
Basic preparation for the job the most important thing about installing standing seam is to measure the roof.
Install endwall flashing onto zee closures by riveting flashing to top flange of zees at 18 inches on center onto top flange of zee.
The lower end of each panel is then trimmed and the hem pre bent before installation see pg 9.
Install zee closures onto panels at both sides.
Installation of a standing seam metal roof involves joining vertical interlocking panels from the top of the roof ridge to the roof s eave edge.
The area where each panel joins the next is raised above the roof s flat surface.
Fasten with appropriate substrate fastener at minimum 4 fasteners per zee or 3 inches on center.
From underlayment venting layout.
Necessary tools materials and supplies a roofing hatchet or a carpenter s hammer.
Step by step instruction on how to install a standing seam metal roof.
Place the first panel with overlap leg along the alignment line.
Metal roofing panels are now available in a wide range of colors and styles.
Use endwall flashing to locate correct position of zee closures.
Pancake screws are applied to the nail strip of the standing seam panels.